EPC plan builder: a staged improvement plan from ten answers
The EPC plan builder takes ten answers, most of them straight from your certificate, and sorts the work your home is likely to need into five stages: repairs, low-cost measures, fabric, heating and renewables. It then lists the funding that may fit your nation, tenure and band. It runs in your browser and nothing is sent unless you choose to send it.
Want the plan checked against your actual certificate? Build it, then send it with your details and we reply by email.
Send your EPC detailsBuild your EPC improvement plan
Answer ten questions from your EPC and what you know about the house. The plan appears below straight away; nothing is sent until you choose to send it.
What each question is for
| Question | Where to find the answer | What it changes in the plan |
|---|---|---|
| Nation | Where the home is | Which funding schemes appear |
| Tenure | Owner-occupier, landlord or buyer | Landlord rules and schemes open to owners only |
| Current and target band | Page one of the EPC | Band-based scheme eligibility and the size of the gap |
| Walls | The "Walls" line in the features table | Cavity fill, solid wall insulation or a specialist check |
| Loft | The "Roof" line, or a look in the loft | Whether a loft top-up is in the fabric stage |
| Heating | The "Main heating" line and the boiler's age | Whether heating moves forward or waits for end of life |
| Windows | The "Windows" line | Where glazing sits, and secondary glazing for protected homes |
| Floor | The "Floor" line, or air bricks outside | Underfloor insulation for suspended timber floors |
| Listed or conservation area | Your council's records | Reversible and internal options first |
| Household income | Optional | Whether means-tested schemes are worth checking |
How the builder decides the order
The builder follows the "fabric first" sequence set out in PAS 2035:2023, the British Standards Institution's specification for retrofitting homes. Repairs come before insulation so that moisture is not trapped. Cheap measures come next because nothing later undoes them. Insulation comes before heating so the heating can be sized for a house that loses less heat. Renewables come last because they top up the rating once the demand is down. Where the standard allows an exception, such as a failing boiler, the builder says so.
What the builder does not do
It does not calculate a new EPC score. Only an accredited assessor can produce a rating, using the government's approved method. It does not price the work either: costs depend on your house, and your EPC already prints a typical installation cost against each recommendation. Copy those into the plan budget calculator for a costed plan. And it does not decide your eligibility for any scheme; councils, suppliers and scheme administrators do that. The funding it lists is a starting point to check, with the rules summarised on the grants register.
Turning the result into a plan you keep
Copy the stages into the EPC improvement plan template, add the step numbers and costs from your certificate, and give each stage a trigger or a date. If you send the result using the form below, the plan text goes with your details, so our reply can start from it. We reply by email and do not pass your details to installers or assessors.
Keeping it current
Scheme rules and dates change. The builder's funding notes were last checked on the date at the foot of this page. If you are reading this a long time after that date, check each scheme's own page before relying on it.
Send us your EPC details and we will reply by email
Tell us what your EPC says and what you want to reach. We read every message and reply by email.
Questions people ask
Does the plan builder give me a new EPC rating?
No. Only an accredited energy assessor can produce an EPC. The builder puts the likely work into a sensible order.
Is my information stored?
Not by the builder: it runs in your browser. If you choose to send the form, we receive what you send, as described in the privacy notice.
Why does the builder put solar panels last?
Because it follows the fabric-first order in PAS 2035: insulation and efficient heating first, renewables to top up the rating afterwards.
Sources and last checked
Every rule, date and figure on this page comes from the sources below. Where something is a proposal and not yet law, the page says so.
- BSI, PAS 2035:2023 Retrofitting dwellings for improved energy efficiency (second edition, September 2023): clauses 5.3, 5.5 and 8.1 (checked 25 October 2026)
- GOV.UK Find an energy certificate service (the certificate and its recommendations) (checked 25 October 2026)
- GOV.UK, Find an energy assessor (England, Wales and Northern Ireland; Scotland has its own register) (checked 20 October 2026)
- DESNZ, Warm Homes: Local Grant policy guidance (updated July 2026): cost caps of £16,600 and £16,600, delivery window 1 April 2025 to 31 March 2028 (checked 20 October 2026)
- GOV.UK, Apply for the Warm Homes: Local Grant (who can apply and how) (checked 20 October 2026)
- GOV.UK, Energy Company Obligation (ECO): eligibility and how to apply (checked 19 October 2026)
- Ofgem, ECO: homeowners and tenants (ECO is not a grant scheme; suppliers decide what to fund) (checked 25 October 2026)
- GOV.UK, Apply for the Boiler Upgrade Scheme: what you can get and eligibility (checked 19 October 2026)
- Welsh Government, Nest: free home energy efficiency improvements, eligibility (checked 19 October 2026)
- Home Energy Scotland, grant and loan funding table (checked 25 October 2026)
- Northern Ireland Housing Executive, Affordable Warmth Scheme (checked 25 October 2026)
Last checked 25 October 2026. Corrections are welcome through the contact form.