EPC Improvement Plan

How to create an EPC improvement plan, step by step

You can create a sound EPC improvement plan yourself in an evening, using your certificate, a torch and a tape measure. This guide walks through the seven steps in order, and the template gives you somewhere to write each one down.

Short of time? The plan builder applies these seven steps to ten answers and shows the result straight away.

Send your EPC details Use the plan builder

Step 1: get your current certificate

Look up the property on the GOV.UK Find an energy certificate service, which covers England, Wales and Northern Ireland; homes in Scotland are on the Scottish EPC Register. Note the certificate number, the date it was lodged, the current rating and score, and the potential rating. An EPC is valid for ten years, so an in-date certificate is a fair starting point even if it is a few years old.

Check one thing before relying on it: whether the home has changed since the assessment. A new boiler, a loft conversion or an extension all change the starting position. If the certificate is out of date or describes a different house, commission a new one from an accredited assessor before you plan any significant spending. Assessments for existing homes now use RdSAP 10, introduced from mid-2025, so an older certificate may model the same house slightly differently.

Step 2: read the recommendations properly

The recommendations page lists numbered steps. Each shows a typical installation cost, a typical yearly saving and the rating the home could reach after that step and all the steps before it. That last column is cumulative, which is easy to misread: step 5 only reaches the rating shown if steps 1 to 4 are already done. Write each step into column one of your plan. Our guide to EPC recommendations explains every column and the assumptions behind the savings.

Step 3: check the house against what the EPC says

An assessor working to RdSAP records what they can see and uses assumed values where they cannot. Spend twenty minutes checking the main descriptions against reality:

If the certificate says "assumed" against something you can now see, or describes something that has since changed, record it. Those differences are often where a new assessment finds points the old one missed.

Step 4: set the target and the deadline

A plan needs a destination. Write down the band you want to reach and why: lower bills, a sale or re-mortgage, a lender's green mortgage criteria, or the rules for letting. Landlords in England and Wales must meet EPC E today, and the government has proposed EPC C for all private tenancies from 1 October 2030, so far as a proposal rather than law. Then write the date you need it by. A deadline changes the plan more than any other input: it decides whether you can wait for the boiler to fail or must replace it on a schedule.

Step 5: put the work in order and note the interactions

Sort your list into the five stages: repairs, low-cost measures, fabric, heating, renewables. Then go through it line by line asking two questions. Does this job depend on another one? Does doing it now make a later job harder or cheaper?

This is the part of the plan that a recommendations list cannot do for you, and the part that saves the most money.

Step 6: budget each stage and match the funding

Copy the typical installation cost for each step into the plan budget calculator to get a range for each stage and for the whole plan. Add the jobs the EPC does not price: repairs, making good, ventilation and a new certificate at the end. Then work through the funding for your nation on the grants register. Funding sometimes changes the order. A council scheme might cover insulation this year but not next, which is a good reason to bring the fabric stage forward.

Two rules protect you. Do not pay for anything on the strength of a scheme until the funding is confirmed in writing; Ofgem's advice on ECO is to agree only once you have a contract. And if someone contacts you unprompted about a scheme, check with your council or energy supplier before going further, as GOV.UK advises.

Step 7: schedule it, keep the evidence, then re-assess

Give every stage a target date and a trigger: "loft before winter", "walls when the roof is scaffolded", "heat pump when the boiler fails or by 2029". Keep every invoice, guarantee and certificate in one place, along with photographs of hidden work such as insulation under floors or behind boards. When the main stages are complete, a new EPC records the improvement and replaces the old certificate on the register. Update the plan as you go; PAS 2035 expects a plan to be revised as work is done and as products and standards change, and a home plan should be no different.

What a finished plan looks like

One page per stage is enough: the measures, the order, the cost range, the funding, the trigger and the evidence. The EPC improvement plan template is laid out that way, and the worked examples show three plans built with it.

Send us your EPC details and we will reply by email

Tell us what your EPC says and what you want to reach. We read every message and reply by email.

We reply by email. This is an independent information site: we do not pass your details to installers or assessors, and we do not book surveys or visits. See our privacy notice.

Questions people ask

Can I make an EPC improvement plan myself?

Yes. Your EPC gives the starting list, and the seven steps on this page add the order, budget and funding. A retrofit coordinator's plan under PAS 2035 is a more formal version, usually needed when a funded scheme is paying for the work.

How long does it take to create a plan?

An evening for a first version, if you have your EPC and can check the loft, walls and heating. Getting quotes for each stage takes longer.

What if my EPC is wrong?

Raise it with the assessor first and then with their accreditation scheme, which is the complaints route GOV.UK describes. If the home has changed since the assessment, a new EPC is usually the quicker fix.

Should I do everything the EPC recommends?

Not necessarily. Reach your target band in the cheapest sensible order and stop there, unless the remaining steps pay for themselves in lower bills.

Sources and last checked

Every rule, date and figure on this page comes from the sources below. Where something is a proposal and not yet law, the page says so.

Last checked 25 October 2026. Corrections are welcome through the contact form.