EPC improvement plan template you can fill in
This EPC improvement plan template has six sections. Copy them into a notebook, a spreadsheet or a printout, and fill them in from your certificate and a walk round the house. The structure mirrors what PAS 2035:2023 requires of a formal medium-term improvement plan, simplified for a homeowner or landlord.
Prefer to have it filled in for you? Send your EPC details and we reply by email with the measures already in order.
Send your EPC details Use the plan builderSection A: the property and its certificate
| Item | Where to find it | Your entry |
|---|---|---|
| Address and property type | Page one of the EPC | |
| Certificate number and date lodged | Page one; valid ten years from that date | |
| Current rating and score | The rating chart (for example D, 61) | |
| Potential rating and score | The same chart, second arrow | |
| Walls, roof, floor, windows, heating, hot water as described | The features table, with any "assumed" values marked | |
| Target band and the date you need it by | Your decision |
Write down the score as well as the letter. Bands are wide, and two homes rated D can be a dozen points apart. The score tells you how far you are from the next band boundary, and it is the number the next assessment will move.
Section B: constraints
List anything that limits what can be done or when: a listed building or conservation area, damp or structural problems, a flat with a shared roof or walls, a lease that needs the freeholder's consent, tenants in place, access for scaffolding, a planned extension. PAS 2035 puts constraints first for good reason; a measure that cannot be installed is not part of the plan, however good its saving looks.
Section C: the measures, in order
| Stage | Measure (EPC step number) | Typical cost from EPC | Typical yearly saving | Depends on | Funding | Trigger or target date | Status |
|---|---|---|---|---|---|---|---|
| 0 Repairs | e.g. clear gutters, repoint gable | not on EPC | - | - | - | before any insulation | |
| 1 Low cost | e.g. draught-proofing; heating controls (step 3) | - | this month | ||||
| 2 Fabric | e.g. loft to 270 mm (step 1); cavity fill (step 2) | repairs done | before winter | ||||
| 3 Heating | e.g. air source heat pump (step 6) | fabric done | when boiler fails | ||||
| 4 Renewables | e.g. solar PV (step 7) | roof sound | last |
The "depends on" column is the heart of the template. It is where you note that the heat pump waits for the insulation, that the floor job waits for the rewire, or that the solar panels wait for the roof. If a row has nothing in it, ask whether it really has no dependencies; most measures have at least one.
Section D: budget and funding log
For each stage, record the EPC's cost range, then each written quote as it arrives, then the funding applied for, the date it was confirmed in writing and the amount. Keep a running total of the gap you are paying yourself. The plan budget calculator will total the ranges for you, and the payback calculator ranks the steps by how quickly their savings repay them.
Section E: evidence
Record what proves each job was done properly: invoices, guarantees, installer certificates, building control or competent person sign-off where it applies, and photographs of anything that will be hidden. This is what the next assessor needs to give you credit, and what a buyer's surveyor or a council officer will ask for.
Section F: checks and reviews
Note how you will know each stage worked: lower bills over the same months, no new condensation, rooms reaching temperature. Set a review date after each stage and a final date for a new EPC. Revise the plan when anything changes, whether that is a new grant, a failed boiler or a change in the rules for rented homes.
How to use the template well
Fill it in from the top. It is tempting to start at Section C with the exciting measures, but the property details and constraints are what stop a plan going wrong. Keep it short: one line per measure is enough. Treat the cost column as a range until you have written quotes, and never treat funding as certain until it is confirmed in writing. Above all, keep it up to date. A plan that records what was done, when and with what evidence is worth far more at the next assessment than one that only records what was intended.
If you would like a second pair of eyes, send the template's key facts through the form below. We reply by email; we do not pass your details to installers or assessors.
Using this template elsewhere? You are welcome to reproduce it with a link to this page. Template structure last checked against PAS 2035:2023 on 25 October 2026.
Send us your EPC details and we will reply by email
Tell us what your EPC says and what you want to reach. We read every message and reply by email.
Questions people ask
Is this the same as a PAS 2035 medium-term improvement plan?
No. It follows the same structure, but a PAS 2035 plan is prepared by a retrofit coordinator as part of a formal retrofit project. This template is for planning your own home.
Can I use a spreadsheet instead?
Yes. Make one tab per section, and in Section C one row per measure with the eight columns shown.
What should I put as the target date?
The date of the event that needs the rating: a sale, a new tenancy or a funding deadline. If there is no event, use triggers such as "when the boiler fails".
Sources and last checked
Every rule, date and figure on this page comes from the sources below. Where something is a proposal and not yet law, the page says so.
- BSI, PAS 2035:2023 Retrofitting dwellings for improved energy efficiency (second edition, September 2023): clauses 5.3, 5.5 and 8.1 (checked 25 October 2026)
- GOV.UK Find an energy certificate service (the certificate and its recommendations) (checked 25 October 2026)
- GOV.UK, Energy Performance Certificates when you buy, sell or rent (valid for 10 years) (checked 20 October 2026)
Last checked 25 October 2026. Corrections are welcome through the contact form.