EPC Improvement Plan

Your EPC improvement plan: what to do, in what order, and how to pay for it

An EPC improvement plan turns the recommendations on your Energy Performance Certificate into a sequence you can follow: which jobs come first, which have to wait, what the whole plan is likely to cost and which funding fits your home and your part of the UK. Answer ten questions in the plan builder for an instant, staged plan, or send us what your EPC says and we reply by email.

Your certificate already lists the measures. What it does not tell you is the order that avoids paying twice, or which grant applies where you live. That is what a plan adds.

Send your EPC details

Build your EPC improvement plan

Answer ten questions from your EPC and what you know about the house. The plan appears below straight away; nothing is sent until you choose to send it.

Why the order matters more than the list

Every EPC ends with a list of recommended steps. Each step shows a typical installation cost, a typical yearly saving and the rating the home could reach after that step and the ones before it. The list is useful, but it is a modelling sequence, not a building programme. It does not know that your boiler is failing, that the roof is due for re-covering next year, or that you plan to let the house in eighteen months.

Doing the right jobs in the wrong order is the most common way to overspend. A heat pump sized for a draughty, uninsulated house is bigger and dearer than one sized after the loft and walls are done. Solar panels fitted before the fabric work can lift the rating while leaving the house cold and the bills high. New windows bought before a cheap loft top-up spend the most money per rating point first.

The industry standard for whole-house retrofit, PAS 2035:2023 from the British Standards Institution, sets out a "fabric first" order for exactly this reason. It also makes a practical point worth planning around: a heating system typically lasts about 15 years, while insulation can last around 60, so a home may go through several heating systems during the life of its insulation. Get the fabric right once and every later heating decision becomes smaller and cheaper.

The five stages of an EPC improvement plan

StageWhat it coversWhy it sits hereWhere to look on your EPC
0. RepairsDamp, leaks, cracked render, failed pointing, structural defectsInsulation over a wet or failing wall traps moisture and can make things worseNot listed: the EPC does not assess condition
1. Low costDraught-proofing, heating controls, cylinder jacket, low-energy lightingCheap, quick, and nothing later undoes themHeating controls, hot water and lighting lines
2. FabricLoft, wall and floor insulation, then glazingCuts heat demand, so the heating that follows can be smallerWalls, roof, floor and windows descriptions and the matching steps
3. HeatingBoiler replacement, heat pump, storage heaters, hot waterSized to the improved fabric, timed to the end of the old system's lifeMain heating and the heating recommendations
4. RenewablesSolar PV, solar water heating, batteriesTops the rating up once demand is down; limited by roof spaceUsually the last steps on the list

The plan builder above applies this order to your answers. There are sensible exceptions, and PAS 2035 names the obvious one: a worn-out boiler should be replaced even if the insulation cannot be afforded yet. A good plan records the exception and the reason, so the next decision is made with the full picture.

What goes into a proper plan

PAS 2035 calls the document a medium-term improvement plan and, since the 2023 edition, sets out what it must contain. In plain terms, a plan worth the name does six things:

  1. Records the constraints: the age and construction of the house, whether it is listed or in a conservation area, and how it is used.
  2. Lists every measure needed to reach the target, including enabling work such as repairs and ventilation, not only the headline items.
  3. Flags the interactions between measures: insulation that changes ventilation needs, or a floor job that is cheaper while the boards are up for something else.
  4. Puts the measures in order, bearing in mind that some are best done together and some make others harder later.
  5. Says how you will check each stage worked.
  6. Stays editable, so it can be updated as work is done and as products and rules change.

Our EPC improvement plan template follows that structure in a form you can fill in yourself, and the PAS 2035 guide explains what a retrofit coordinator's version adds.

Build the budget from your EPC's own numbers

Generic price lists are the weakest part of most EPC advice, because costs depend on the size, construction and condition of a specific house. Your certificate already prints a typical installation cost range against each step. Copy those into the plan budget calculator, put each one in a stage, and you have a first budget for the whole plan and for each stage. Replace each range with written quotes as you go.

A few published figures help set expectations. For private landlords, the government's response on raising rented homes to EPC C proposes a cost cap of £10,000 per property and estimates average spend of around £5,400; today's legal cap for reaching the current minimum of E is £3,500 including VAT. Councils delivering the Warm Homes: Local Grant in England work to cost caps of £16,600 per home for energy performance upgrades and £16,600 for low-carbon heating, averaged across their projects. For solar, DESNZ cost data for 2025/26 puts the median installed cost of a 0 to 4 kW system at about £1,595 per kW. Our guide to EPC improvement costs shows how to use these without mistaking them for a quote.

Funding depends on where you live

Energy efficiency support is devolved, so the funding column of your plan changes at the border:

NationMain routes (checked 25 October 2026)
EnglandWarm Homes: Local Grant (council-run, homes rated D to G, income usually up to about £36,000), ECO4 (supplier-funded, until 31 December 2026), Boiler Upgrade Scheme for heat pumps
WalesNest (Welsh Government, means-tested), Green Homes Wales interest-free loans, ECO4, Boiler Upgrade Scheme
ScotlandHome Energy Scotland grant and loan, where insulation grants need a valid EPC that recommends the measure; ECO4
Northern IrelandAffordable Warmth Scheme for households with gross income under £23,000; ECO does not run here

The Great British Insulation Scheme ended on 31 March 2026, so any plan that still counts on it needs updating. The full register, with eligibility and what each scheme funds, is on our grants for EPC improvements page.

A realistic timeline

Few households do everything at once. A practical plan ties each stage to a trigger. Stage 1 can usually be done within weeks. Fabric work is cheapest when it rides along with other jobs: loft insulation when the loft is cleared, floor insulation when floors are lifted, external wall insulation when scaffolding is up for the roof. The heating decision belongs to the end of the current system's life, unless it is failing now. Renewables come last, once you know how much energy the improved house actually uses.

When the work is done, a new EPC records it. A certificate is valid for ten years, or until a newer one is lodged for the property, so the new rating replaces the old one for anyone who looks it up. If you are selling, re-mortgaging or starting a new tenancy, plan the timing so the improved certificate is lodged before it is needed.

Rules that may shape your target

Most homeowners choose their own target. Landlords in England and Wales have one set for them: the minimum to let today is EPC E. The government has proposed EPC C, measured on new metrics, for all private tenancies from 1 October 2030; that is a proposal and not yet law. EPCs themselves are changing. The current methods are SAP 10.3 and RdSAP 10.0.1, and the government's guidance says the Home Energy Model is still to be introduced. A plan that records the current score, the date of the certificate and the method used will survive those changes better than one that only records a letter.

Not to be confused with the government's "Improving Energy Performance Certificates: action plan", which is a policy paper about how the EPC system itself is run, not a plan for your home.

How this site works

EPC Improvement Plan is an independent information site. We are not an energy assessor, a retrofit coordinator or an installer, and we do not sell measures. The plan builder and calculators work in your browser. If you send your details, we read them and reply by email with a sequenced plan based on what your EPC says; we do not pass enquiries to installers or assessors. Read more on the about page.

Send us your EPC details and we will reply by email

Tell us what your EPC says and what you want to reach. We read every message and reply by email.

We reply by email. This is an independent information site: we do not pass your details to installers or assessors, and we do not book surveys or visits. See our privacy notice.

Questions people ask

What is an EPC improvement plan?

A sequenced list of the work needed to raise a home's EPC rating to a chosen band, with the order, a budget for each stage, the funding that applies and a timeline. It starts from the recommendations on your certificate and adds the order, interactions and money that the certificate does not cover.

Is the plan builder free?

Yes. It runs in your browser and shows the plan on the page. Nothing is sent unless you choose to send your details.

Do I need a new EPC before making a plan?

Not usually. Start from your current certificate if it is in date (EPCs are valid for ten years). If the home has changed a lot since it was assessed, or there is no certificate, a new one gives a better starting list.

In what order should EPC improvements be done?

Repairs first, then low-cost measures, then insulation and other fabric work, then heating, then renewables such as solar. This "fabric first" order is the one PAS 2035 sets out. A failing boiler is the main exception.

Who will reply to my enquiry?

We will, by email. This site does not pass your details to installers or assessors and does not book surveys or visits.

Sources and last checked

Every rule, date and figure on this page comes from the sources below. Where something is a proposal and not yet law, the page says so.

Last checked 25 October 2026. Corrections are welcome through the contact form.