A home in band F scores between 21 and 38 on its certificate. Reaching E means a score of 39 or more. An EPC F to E improvement plan is usually about the basics: heat escaping through an uninsulated roof or walls, heating that is expensive or hard to control, and draughts. The good news is that these are the cheapest points on the certificate, and low-band homes are where most funding is aimed.

Rated F? Send your certificate details and we reply by email with a staged plan and the schemes that may fund it.

Send your EPC details Use the plan builder

What usually keeps a home in band F

Look at the features table on your certificate. Homes in F typically show several of these at once: walls described as solid or as a cavity with no insulation, little or no loft insulation, single glazing, electric room heaters or an old boiler, and no heating controls. Each feature costs points on its own; together they sink the score. The point of the plan is to find the two or three that are cheapest to fix.

The plan, in order

Stage 0: make the house sound

Many F-rated homes have been empty, neglected or let for years without investment. Before any insulation goes in, deal with roof leaks, blocked gutters, rising or penetrating damp and broken windows. Insulation installed over a damp problem can trap moisture and cause mould and decay.

Stage 1: controls and draughts

If the heating has no programmer, room thermostat or radiator valves, adding them is usually one of the cheapest recommendations on the list. Draught-proofing doors, windows and the loft hatch costs little and makes the house noticeably more comfortable. Keep ventilation working: air bricks clear, extractor fans in kitchens and bathrooms.

Stage 2: roof and walls

For most F to E moves, the fabric stage does the heavy lifting. A loft with little or no insulation is often the single best-value step on the certificate. An empty cavity wall, if the cavity is suitable, usually follows. Solid walls are harder and costlier; where the house has them, check whether the loft, floor and controls alone can cross the line into E before committing to wall insulation.

Stage 3: the heating, if it is the problem

If the main heating is old electric room heaters or an inefficient boiler, the rating may not move far until the heating changes. Plan the replacement after the fabric work if you can, so the new system is sized for a house that loses less heat. If the existing system has failed, replace it now and record that it was sized before the insulation.

How far the plan needs to go

The band boundary is a single point. Check the potential rating column on the recommendations page: it shows the rating after each step and those before it. Find the first step where it reaches E, then ask whether those steps are the cheapest route, or whether swapping one for another reaches the same score for less. Stop the F to E plan there, but keep the rest of the list in the plan as the next phase.

Funding aimed at low-band homes

Most means-tested support targets the homes rated lowest:

Details and dates are on the grants register.

If you let the home

In England and Wales a privately rented home must reach at least EPC E before a new tenancy, and all tenancies have been covered since 1 April 2020, unless a valid exemption is registered. An F-rated rental therefore needs this plan before it can lawfully be let. Today's cost cap is £3,500 including VAT. If every relevant improvement that can be made within that cap has been made and the home is still below E, the landlord can register an "all relevant improvements made" exemption; it lasts five years, as does the high-cost exemption. The landlord plan page covers the sequence around tenancies.

After the move to E

Lodge a new EPC once the work is done so the improvement is on the register. Then look again at the rest of the list. An E is the legal floor for letting today and still a cold, expensive home to run; the steps that took you from F to E are the start of a longer plan, not the end of it. The E to D plan picks up from here.

Send us your EPC details and we will reply by email

Tell us what your EPC says and what you want to reach. We read every message and reply by email.

We reply by email. This is an independent information site: we do not pass your details to installers or assessors, and we do not book surveys or visits. See our privacy notice.

Questions people ask

Can I let a property rated F?

Not on a new or existing tenancy in England and Wales unless a valid exemption is registered. The minimum is E.

Which steps usually come first in an F to E plan?

Usually heating controls, draught-proofing and loft insulation, then cavity fill where suitable. Your certificate's cost and potential rating columns show which steps reach E first.

Will a new boiler get me from F to E?

Sometimes, if the old heating was very inefficient. It is usually cheaper to insulate first and size the heating afterwards, unless the boiler has failed.

Sources and last checked