EPC Improvement Plan

Worked examples: three illustrative EPC improvement plans

These three examples show how an EPC improvement plan comes together for different homes. They are illustrations, not customer stories: the homes are typical types, not real addresses, and no costs or scores are given because those depend on a real certificate. What they show is the reasoning: how the order, the funding and the timing are decided.

Want the same reasoning applied to your home? Send your certificate details and we reply by email.

Send your EPC details Use the plan builder

Example 1: a cavity-walled semi in England, rated D, gas boiler 12 years old

The certificate shows: cavity walls "as built, no insulation (assumed)", 100 mm of loft insulation, double glazing, a gas boiler with a programmer but no room thermostat. Recommendations: loft top-up, cavity fill, room thermostat, solar panels.

Constraints: none significant. The owner wants a C before remortgaging in about a year.

The plan: Stage 1 adds the room thermostat and radiator valves and draught-proofs the doors. Stage 2 tops up the loft and, after a check confirms the cavity is suitable, fills it; the owner first looks for drill-hole patches in case it was filled before. The boiler is working, so the heating step waits for the end of its life and the plan notes a heat pump as the likely replacement, sized for the insulated house. If the potential rating column shows the home still short of C after stage 2, solar becomes the closing step.

Funding: the household's income is above the Warm Homes: Local Grant threshold, so the plan is self-funded. The zero VAT rate on installing energy-saving materials applies until 31 March 2027, which sets the timing for the fabric stage.

Timing: fabric work before the new EPC is commissioned, and the new EPC lodged before the remortgage application.

Example 2: a solid-walled Victorian terrace in a Welsh conservation area, rated E, let to tenants

The certificate shows: solid brick walls, no insulation; a loft with little insulation; single-glazed sash windows; a gas boiler; a suspended timber floor. Recommendations: loft insulation, internal wall insulation, floor insulation, double glazing, solar panels.

Constraints: conservation area (front elevation, windows and roof face the street); tenants in place until a known end date.

The plan: Stage 0 fixes damp at the rear and the gutters. Stage 1 draught-proofs the sashes and adds controls while tenants are in. Stage 2 is split: loft insulation now with the tenants' agreement; internal wall insulation on the rear wall and outrigger, and floor insulation, during the next void; secondary glazing rather than replacement sashes, because of the conservation area. Solar stays in the plan but is parked pending a check on what is acceptable on a street-facing roof.

Funding: the Boiler Upgrade Scheme is noted for the future heat pump decision. Nest is checked against the tenant household's circumstances. Green Homes Wales loans are not open to private landlords.

Rules: E meets today's minimum; the landlord plans towards C because of the government's 2030 proposal, recorded in the plan as a proposal.

Example 3: an off-gas detached bungalow in rural Scotland, rated F, oil boiler failing

The certificate shows: cavity walls, filled; loft insulation thin; double glazing; an oil boiler with basic controls. Recommendations: loft insulation, heating controls, an air source heat pump, solar panels.

Constraints: the boiler is failing this winter.

The plan: the failing boiler forces an exception to fabric first. The loft top-up and controls go in first because they take days, then the heating is replaced. The plan considers an air source heat pump sized for the house after the loft work, rather than another oil boiler, and checks the hot water cylinder. Solar follows if the target needs it.

Funding: Home Energy Scotland offers a heat pump grant of £7,500 plus £1,500 for rural homes, and loft insulation grants for measures the EPC recommends. A heat pump does not need an EPC recommendation for that funding, but the loft grant does, and this certificate lists it.

What the examples have in common

In each case the certificate supplied the list, and the plan supplied the order, the constraints, the funding and the timing. None of them follows the certificate's order exactly, and each records why. That is the difference between a list of recommendations and an EPC improvement plan.

Send us your EPC details and we will reply by email

Tell us what your EPC says and what you want to reach. We read every message and reply by email.

We reply by email. This is an independent information site: we do not pass your details to installers or assessors, and we do not book surveys or visits. See our privacy notice.

Questions people ask

Are these real homes?

No. They are illustrations of typical homes, written to show how a plan is reasoned. They contain no real costs, scores or addresses.

Can I get a plan like this for my home?

Use the plan builder for an instant version, or send your certificate details and we reply by email.

Sources and last checked

Every rule, date and figure on this page comes from the sources below. Where something is a proposal and not yet law, the page says so.

Last checked 25 October 2026. Corrections are welcome through the contact form.