1960s house EPC improvement plan: what to check and in what order
Houses from the 1960s are a broad group: brick-built semis and terraces with cavity walls, estates of system-built and timber-framed homes, and many with large windows, flat-roofed extensions or garages with rooms above. A 1960s house EPC improvement plan starts by finding out which of these you have, because the right order of work depends on it.
Tell us what your EPC says about the walls, roof and heating and we reply by email with a plan for your 1960s house.
Send your EPC details Use the plan builderFirst, identify the construction
Look at the walls description on your certificate. A 1960s house might be recorded as a cavity wall, a timber frame or a "system built" wall. These lead to very different plans:
- Brick cavity walls: the cavity may have been built empty and filled later, or never. Drill-hole patches in the mortar suggest it has been filled. If the EPC says "as built, no insulation (assumed)", the assessor may not have been able to tell.
- Timber frame or tile-hung panels: some homes of the period combine brick with panels of timber, tiles or cladding. Wall insulation here needs specialist advice because of moisture and fire risk.
- System built: concrete panel and other non-traditional homes need a specialist structural and moisture assessment before any wall work.
Getting this right first stops the plan from budgeting for a measure the house cannot take.
The places 1960s homes lose heat
Large windows. Picture windows and full-height glazing were popular. If they are still single glazed or early double glazing, they lose a lot of heat, but replacement is expensive per rating point, so it usually waits until after the cheaper fabric steps.
Flat roofs. Extensions, garages and some whole houses have flat roofs, which are hard to insulate except when the covering is replaced. Put flat-roof insulation in the plan with the trigger "next re-covering", so the work is done once.
The main loft. Where there is a pitched roof, the loft is usually easy to access and one of the cheapest steps. EPCs normally phrase it as increasing loft insulation to 270 mm.
Floors. Many homes of this age have solid concrete floors, which are rarely worth insulating unless the floor is being replaced. Where there is a suspended timber floor, underfloor insulation is a fabric step to time with any work that lifts floorboards.
A typical order for a 1960s house
- Repairs: flat-roof leaks, failed window seals, damp at the base of walls.
- Low cost: heating controls, cylinder insulation, draught-proofing, especially around large windows and external doors.
- Fabric: loft, then cavity fill if the walls are a suitable cavity, then floors where accessible.
- Glazing and flat roofs, each tied to its natural trigger.
- Heating at the end of the current system's life, sized after the fabric stage.
- Solar on a sound, well-oriented roof as the closing step if the target needs it.
Heating in 1960s homes
Some homes of this era were built with warm-air systems or electric storage heaters, later converted to gas boilers. Check what the EPC records as the main heating and whether any old ducts or storage heaters remain. If the home is off the gas network and heated by oil or LPG, the Boiler Upgrade Scheme pays £9,000 towards an air or ground source heat pump until 31 March 2027 in England and Wales; for a mains gas home it is £7,500.
Funding and the band you start from
If the home is rated D or below, the Warm Homes: Local Grant (England) and ECO4 (until 31 December 2026) may apply for eligible households. In Scotland, Home Energy Scotland funds the insulation measures the EPC recommends, and in Wales and Northern Ireland the means-tested schemes on the grants register apply. Use the band pages, such as the D to C plan, for the budget and timing once you know your starting score.
Write it down
A 1960s house plan often has more "trigger" items than most: the flat roof, the large windows, the old heating. Record each with its trigger in the template so that when the trigger arrives, the decision is already made.
Send us your EPC details and we will reply by email
Tell us what your EPC says and what you want to reach. We read every message and reply by email.
Questions people ask
Do 1960s houses have cavity walls?
Many brick-built homes of the period do, but others are timber-framed or system-built. Your EPC records what the assessor found; check it before planning wall insulation.
Is it worth replacing 1960s windows to improve the EPC?
It helps, but glazing usually costs more per rating point than loft or cavity insulation, so it normally comes later in the plan.
Can a flat roof be insulated?
Yes, usually when the roof covering is replaced. Plan it for that trigger rather than as a separate job.
Sources and last checked
Every rule, date and figure on this page comes from the sources below. Where something is a proposal and not yet law, the page says so.
- GOV.UK Find an energy certificate service (the certificate and its recommendations) (checked 25 October 2026)
- BSI, PAS 2035:2023 Retrofitting dwellings for improved energy efficiency (second edition, September 2023): clauses 5.3, 5.5 and 8.1 (checked 25 October 2026)
- GOV.UK, Apply for the Boiler Upgrade Scheme: what you can get and eligibility (checked 19 October 2026)
- DESNZ, Warm Homes: Local Grant policy guidance (updated July 2026): cost caps of £16,600 and £16,600, delivery window 1 April 2025 to 31 March 2028 (checked 20 October 2026)
- GOV.UK, Apply for the Warm Homes: Local Grant (who can apply and how) (checked 20 October 2026)
- GOV.UK, Energy Company Obligation (ECO): eligibility and how to apply (checked 19 October 2026)
- Ofgem, ECO: homeowners and tenants (ECO is not a grant scheme; suppliers decide what to fund) (checked 25 October 2026)
- Home Energy Scotland, grant and loan funding table (checked 25 October 2026)
Last checked 25 October 2026. Corrections are welcome through the contact form.